Sunshine Health Facilities Resident Building

Building Use: Care facility

Project Type: New passive house building

58-bed state-licensed memory care facility.

27751692570745945hamilton2
State:Washington
PH Calculation Protocol(s):PHIUS+
PH Modeling Software(s):WUFI Passive
PH Certification(s):PHIUS
Year Of Construction:2015

Project Size

Floor Area:17,852.0 ft2iCFA1,658.5 m2iCFA

Performance

Annual heat demand:0.55 kBtu/yr•ft2iCFA1.7 kWh/yr•m2iCFA
Heat load:1.17 Btu/hr•ft2iCFA3.7 W/m2iCFA
Annual cooling demand:0.69 kBtu/yr•ft2iCFA2.2 kWh/yr•m2iCFA
Cooling load:0.84 Btu/hr•ft2iCFA2.6 W/m2iCFA
Primary energy demand:14.20 kBtu/yr•ft2iCFA44.8 kWh/yr•m2iCFA
Primary energy demand after on-site generation:14.20 kBtu/yr•ft2iCFA44.8 kWh/yr•m2iCFA
Airtightness:0.04 ft3/min•ft2

Envelope

Construction Type:wood
Floor Assembly:5" slab + 6" EPS
Wall Assembly:2 x 6 structural wall, 12" TJI wall with blown-in cellulose
Roof Assembly:Truss roof with 24" cellulose
Windows:Zola
Entry Doors:Therma-Tru

Systems

Ventilation system:UltimateAir
Heating/Cooling system:Mitsubishi

Team

Passive House Consultant:Sam Rodell
Passive House Consultant Certification:PHIUS
Architect:Sam Rodell Architects
Structural Engineer:Sam Boydsten
Contractor:Jon Hawley, Tamarack Ridge Construction

Comments