Building Use: Care facility
Project Type: New passive house building
58-bed state-licensed memory care facility.
State: | Washington | |
PH Calculation Protocol(s): | PHIUS+ | |
PH Modeling Software(s): | WUFI Passive | |
PH Certification(s): | PHIUS | |
Year Of Construction: | 2015 | |
Project Size | ||
Floor Area: | 17,852.0 ft2iCFA | 1,658.5 m2iCFA |
Performance | ||
Annual heat demand: | 0.55 kBtu/yr•ft2iCFA | 1.7 kWh/yr•m2iCFA |
Heat load: | 1.17 Btu/hr•ft2iCFA | 3.7 W/m2iCFA |
Annual cooling demand: | 0.69 kBtu/yr•ft2iCFA | 2.2 kWh/yr•m2iCFA |
Cooling load: | 0.84 Btu/hr•ft2iCFA | 2.6 W/m2iCFA |
Primary energy demand: | 14.20 kBtu/yr•ft2iCFA | 44.8 kWh/yr•m2iCFA |
Primary energy demand after on-site generation: | 14.20 kBtu/yr•ft2iCFA | 44.8 kWh/yr•m2iCFA |
Airtightness: | 0.04 ft3/min•ft2 | |
Envelope | ||
Construction Type: | wood | |
Floor Assembly: | 5" slab + 6" EPS | |
Wall Assembly: | 2 x 6 structural wall, 12" TJI wall with blown-in cellulose | |
Roof Assembly: | Truss roof with 24" cellulose | |
Windows: | Zola | |
Entry Doors: | Therma-Tru | |
Systems | ||
Ventilation system: | UltimateAir | |
Heating/Cooling system: | Mitsubishi | |
Team | ||
Passive House Consultant: | Sam Rodell | |
Passive House Consultant Certification: | PHIUS | |
Architect: | Sam Rodell Architects | |
Structural Engineer: | Sam Boydsten | |
Contractor: | Jon Hawley, Tamarack Ridge Construction | |
Comments |